Application guide · Telecom power

Solar for Telecom Towers: 48 V DC Base Station Power Design

48 V DC · 5–10 kWp · 20–40 kWh LFP · 99.9% site availability

Solar for telecom tower sites is a different problem from solar for a house: the load never sleeps, the site is usually a lease with no grid, and the penalty for downtime is measured in dropped calls across a whole district. A typical 4G macro site in Nigeria or the Philippines draws 600–1,200 W continuously, which is 14–29 kWh a day — five to ten times a village household.

Typical site load

600–1,200 W continuous

Array

5–10 kWp

Battery autonomy

8–12 h (25–40 kWh)

This page sets out how we size solar for telecom tower sites: the load audit that separates rectifier, radio and cooling, the 48 V DC architecture that avoids double conversion, the array and battery combinations that hold a site through an 8–12 hour outage, indicative EXW cost bands, and the site rules — theft, tilt, grounding, generator handover — that decide whether the hybrid actually saves diesel.

The three costs a BTS site carries

Every off-grid tower carries three costs at once: diesel, diesel logistics and downtime. A 900 W site running a 20 kVA generator 24/7 burns roughly 5–7 litres an hour at partial load, which is 40–55 litres a day — and in northern Nigeria or the Philippine islands the fuel truck is the single largest failure mode, not the generator itself.

The second problem is architecture. Many sites were built as AC-coupled: the rectifier converts 230 V AC to −48 V DC, so a solar inverter has to make AC first and the rectifier turns it back into DC. Every conversion costs 6–10%, and the rectifier keeps running at low load where its efficiency is worst. A DC-coupled array feeding the −48 V bus directly removes one conversion and lets the existing rectifier become the backup rather than the primary source.

The third is thermal and theft. A sealed outdoor cabinet in Lagos reaches 50 °C internally, which halves LFP calendar life; and an unsecured ground mount loses panels within months. Both are design decisions, not maintenance problems.

  • ✓Diesel at 40–55 litres a day per site plus a fuel-logistics chain that fails silently
  • ✓AC-coupled architecture wasting 6–10% through double conversion
  • ✓Rectifier running at 20–30% load, where efficiency drops below 85%
  • ✓Battery cabinet at 50 °C internal, halving LFP service life
  • ✓No remote monitoring, so a failed string is discovered by a dropped-cell complaint

Typical BTS load values

Audit the site in DC amps at the −48 V bus, not in AC watts at the meter. The table below is a 4G macro site with three sectors and a microwave link; 5G sites add 300–600 W per sector and change the array size by 40%.

ItemPowerHoursDaily energy
BBU + 3 × RRU (4G, 3 sectors)450 W24 h10.8 kWh
Microwave / fibre CPE link60 W24 h1.4 kWh
Rectifier and DC losses (8%)45 W24 h1.1 kWh
Cabinet cooling (thermostat fan / AC)250–600 W8–14 h3.0–8.4 kWh
Site lighting, alarms, door sensor30 W12 h0.4 kWh

Total for the reference site: 17–22 kWh a day, or 350–460 Ah at 48 V. Cooling is the variable that gets ignored: replacing a 600 W cabinet air-conditioner with a filtered fan and a shaded cabinet can cut daily energy by 6 kWh, which is one whole battery string.

Recommended configurations

Sizing rule we use: array = daily kWh ÷ (worst-month peak-sun hours × 0.72), battery = load × autonomy hours. The 0.72 derate covers dust, temperature and DC cabling on a tower site, where panels are rarely washed.

TierPV arrayBatteryPower electronicsServes
T1 — 5G micro / small cell1.5–2 kWp (8–10 × 200 W)51.2 V 200 Ah (10.24 kWh)48 V MPPT 60 A + existing rectifier400 W load, 6–8 h autonomy
T2 — 4G macro, 3 sectors5 kWp (25 × 200 W)2 × 51.2 V 400 Ah (40.96 kWh)48 V MPPT 100 A + 48 V rectifier 100 A900 W load, 10–12 h autonomy
T3 — 5G macro + AC cooling10 kWp (50 × 200 W)4 × 51.2 V 400 Ah (81.9 kWh)Dual 48 V MPPT 100 A, generator interface1.8 kW load, 12 h autonomy, genset backup

Keep the generator. Solar for telecom tower sites is almost never sized for 100% availability in the rainy season; the economic optimum is 85–95% solar fraction with a genset that starts automatically below 45 V or after two low-yield days. Trying to hit 100% with battery doubles the capital cost for a handful of nights a year.

Indicative cost ranges (USD, EXW Ningbo)

The bands below are for the DC power plant only: modules, mounting, MPPT, LFP packs and the outdoor cabinet. They exclude civil works, tower strengthening, freight, installation and commissioning, which typically add 20–35% on a remote site.

ItemSpecificationIndicative range
T1 small cell kit2 kWp PV · 10.24 kWh LFP · 48 V MPPT 60 AUSD 4,200 – 5,400
T2 macro site kit5 kWp PV · 40.96 kWh LFP · MPPT + rectifierUSD 11,800 – 14,900
T3 5G macro kit10 kWp PV · 81.9 kWh LFP · dual MPPTUSD 23,500 – 29,000
Outdoor IP55 DC cabinetInsulated, fan-cooled, 19-inch rackUSD 900 – 1,600
Remote monitoring gateway4G, SNMP / Modbus, 8 DIUSD 220 – 380
  • Indicative EXW ranges; final pricing depends on module count, pack tier, cabinet specification and delivery port. Formal quotation follows a site load audit.
  • A 20-site rollout typically lands 10–15% below the single-site band because packs and cabinets ship together.
  • Diesel comparison: a 900 W site at 45 litres a day and USD 1.10/litre spends about USD 18,000 a year on fuel alone — the T2 kit usually pays back in 18–30 months where fuel logistics are unreliable.

All prices on this page are indicative EXW ranges compiled from current container quotations. They are not a binding offer: freight, duties, installation and exchange rates move, and the final price is issued after we receive your load list and delivery port.

Local adaptation: voltage, climate and certification

Telecom sites are specified by the operator, so the local rules that matter are the ones written into the tower lease and the national type-approval list. These four markets cover most of our BTS shipments.

MarketGrid & codeClimateCertification
Nigeria230 V / 50 Hz; −48 V DC bus standard, NEMSA for public power35–40 °C, harmattan dust, high lightning densityNCC type approval for telecom equipment, SONCAP for imports
South Africa230 V / 50 Hz; municipal SSEG rules if the site is grid-tied−5 °C Highveld nights, coastal salt spray, hailSANS 10142-1, ICASA type approval for radio equipment
Ghana230 V / 50 Hz; Energy Commission approvalCoastal humidity >80% RH, 1,800 mm annual rainNCA type approval, EC registration
Philippines220 V / 60 Hz — 60 Hz rectifiers, not 50 Hz unitsTyphoon zone, 250 km/h design wind, 9-month wet seasonNTC type acceptance, DOE compliance for energy projects

Site rules that decide whether the hybrid pays back

1

Meter the site for seven days first

A clamp logger on the −48 V bus and on the rectifier AC input gives the real load profile. Two sites with the same nameplate can differ by 40% because of cooling settings and air-conditioner age.

2

Couple DC, not AC

Feed the MPPT output straight onto the −48 V bus and let the rectifier act as backup. This removes one conversion and lets the existing rectifier idle at zero instead of running at 25% load all day.

3

Set the generator handover thresholds

Start the genset at 46–47 V or after two consecutive days below 60% yield; stop it at 54 V. Without hysteresis the site cycles the generator every few hours and burns more fuel than a pure diesel site.

4

Secure the array against theft

Tamper-proof bolts, welded frame caps and a 2.4 m fence with a monitored door contact. In several West African markets the panels are the most stolen item on site.

5

Shade and ventilate the cabinet

A double-skin roof and a filtered fan hold the cabinet 10–12 °C below ambient. If the operator insists on air-conditioning, set it to 30 °C, not 22 °C — the difference is 3–4 kWh a day.

6

Commission with a load test, not a voltage check

Run the site on battery alone for the contracted autonomy hours and log the discharge curve. A string that sags 3 V early will fail in month eight, not on the day of acceptance.

Frequently asked questions

How much does a solar system for a telecom tower cost?

A 4G macro site with a 900 W continuous load needs about 5 kWp of PV and 40 kWh of LFP, which is USD 11,800–14,900 EXW for the DC plant. A small cell or 5G micro site at 400 W is USD 4,200–5,400. Civil works, installation and freight add 20–35%; a fully installed macro site typically lands at USD 16,000–20,000.

How much diesel does a solar hybrid actually save?

A 900 W site running 24/7 on diesel burns 40–55 litres a day. A correctly sized hybrid at 90% solar fraction cuts that to 4–6 litres, or about 90%, and the remaining fuel is mostly generator exercise runs. At USD 1.10 a litre the saving is roughly USD 16,000 a year, which is why payback lands at 18–30 months.

Why 48 V DC instead of AC-coupled solar?

Because the radio equipment already runs on −48 V DC. An AC-coupled system converts DC to AC and back, losing 6–10% twice a day, and forces the rectifier to run at low load where efficiency falls below 85%. A DC-coupled MPPT feeding the −48 V bus removes one conversion and uses the existing rectifier as backup, which also means the site keeps working if the inverter fails.

How many hours of battery autonomy should a BTS site have?

Eight to twelve hours for a grid-absent site with a generator, and 20–24 hours only where fuel delivery is impossible in the rainy season. Beyond 12 hours the marginal battery cost per avoided outage hour rises sharply, and a generator becomes the cheaper reliability layer.

Can the solar array be added to an existing diesel site?

Yes, and it is the most common retrofit we quote. Keep the rectifier and generator, add a DC-coupled MPPT and a 51.2 V pack on the −48 V bus, and set the generator start threshold to 46–47 V. The existing generator then runs only in the wet season, and the site does not need a new AC distribution board.

Send us the site load log

Share the seven-day DC load profile, the operator's autonomy requirement and the nearest port. We will return a single-line diagram, array and pack count, and an EXW price within two working days.