91.45 kWp BIPV Solar Carport — Guoneng Anji Meixi Power Plant, Zhejiang
Supplied and installed by DLXN: 155 × 590 W modules (91.45 kWp) and two GoodWe 50 kW grid-tied inverters on a steel BIPV carport, completed in 20 days.

2026
Year
BIPV Carport
Category
Anji County, Zhejiang, China
Location
Scope delivered by DLXN — supply and installation
A BIPV carport on the village-committee car park at Longkou Village, Meixi Town, Anji County, Zhejiang — supplied and installed by DLXN: steel canopy structure, 155 × 590 W modules, two GoodWe 50 kW grid-tied inverters, DC wiring and grid interconnection. Completed in a 20-day window in January 2026.
| Owner | Guoneng Anji Meixi Power Plant |
|---|---|
| Supply & installation | DLXN — Donglan New Energy Co., Ltd. |
| Modules | 590 W monocrystalline, 155 pcs — 91.45 kWp |
| Inverters | GoodWe 50 kW grid-tied × 2 (100 kW AC) |
| System type | Grid-tied BIPV carport |
| Build period | 20 days (January 2026) |
Site photos


The 590 W modules are built to order at our own plant in Baoding (20–650 W custom range); the GoodWe inverters are supplied as part of the system package.
Why two 50 kW inverters on a 91.45 kWp array
The carport runs in two pitches, and the two sides do not see the same irradiance or the same string lengths — the east row catches morning sun while the west row is partly shaded by the structure late in the day. Splitting into two 50 kW units lets each side run its own MPPT and its own export limit instead of one inverter averaging the two. The AC side totals 100 kW against 91.45 kWp of modules, a ratio of 0.91: the carport footprint is fixed, so the inverter capacity was sized for the roof we had rather than the roof we would like.