55 kWp Grid-Tied PV — Funeral Service Facility, Honggu District, Lanzhou
Institutional grid-tied array in Gansu: 550 W × 100 = 55 kWp through a GoodWe 50 kW inverter. Designed, supplied, installed and commissioned by DLXN.

2024
Year
Institutional Rooftop
Category
Lanzhou, Gansu, China
Location
Scope delivered by DLXN — design, supply, installation and commissioning
A municipal funeral service facility in Honggu District, Lanzhou, Gansu, needed to cut its daytime electricity bill without touching the building envelope. The array is ground-mounted on concrete ballast along the site boundary, clear of the building and its access routes.
| Site | Funeral service facility, Honggu District, Lanzhou, Gansu |
|---|---|
| DLXN scope | Design, equipment supply, installation and commissioning |
| Mounting | Ground-mounted on concrete ballast blocks — no penetrations in the building envelope |
| Modules | 550 W × 100 = 55 kWp |
| Inverter | GoodWe 50 kW grid-tied |
| DC / AC ratio | 1.10 |
| Completed | May 2024 |
Site photos


Design note
Honggu sits in a dusty, high-irradiance basin. The ballast layout leaves roughly a metre between rows for cleaning access, because in this climate soiling — not shading — is what costs yield. Modules are specified on the same 182 mm platform we build in Baoding, so a replacement in year eight is a stocked item rather than a special order.