Institutional Rooftop2024 · Lanzhou, Gansu, China

55 kWp Grid-Tied PV — Funeral Service Facility, Honggu District, Lanzhou

Institutional grid-tied array in Gansu: 550 W × 100 = 55 kWp through a GoodWe 50 kW inverter. Designed, supplied, installed and commissioned by DLXN.

55 kWp Grid-Tied PV — Funeral Service Facility, Honggu District, Lanzhou

2024

Year

Institutional Rooftop

Category

Lanzhou, Gansu, China

Location

Scope delivered by DLXN — design, supply, installation and commissioning

A municipal funeral service facility in Honggu District, Lanzhou, Gansu, needed to cut its daytime electricity bill without touching the building envelope. The array is ground-mounted on concrete ballast along the site boundary, clear of the building and its access routes.

SiteFuneral service facility, Honggu District, Lanzhou, Gansu
DLXN scopeDesign, equipment supply, installation and commissioning
MountingGround-mounted on concrete ballast blocks — no penetrations in the building envelope
Modules550 W × 100 = 55 kWp
InverterGoodWe 50 kW grid-tied
DC / AC ratio1.10
CompletedMay 2024

Site photos

Ground-mounted array on concrete ballast, Honggu District
Rows set out on concrete ballast along the site boundary — no roof penetrations, no structural changes to the building.
Array with arid hillside behind, Lanzhou
Site context: dry hillside, overhead lines and fencing — the array sits in the only flat band available.

Design note

Honggu sits in a dusty, high-irradiance basin. The ballast layout leaves roughly a metre between rows for cleaning access, because in this climate soiling — not shading — is what costs yield. Modules are specified on the same 182 mm platform we build in Baoding, so a replacement in year eight is a stocked item rather than a special order.