Commercial Rooftop2024 · Xiong'an New Area, Hebei, China

154 kWp Rooftop PV — Rongdong Energy Station No. 5, Xiong'an New Area

Grid-tied rooftop array on a district energy station: 550 W × 280 = 154 kWp with a GoodWe 100 kW plus two 25 kW inverters. Designed, supplied, installed and commissioned by DLXN in August 2024.

154 kWp Rooftop PV — Rongdong Energy Station No. 5, Xiong'an New Area

2024

Year

Commercial Rooftop

Category

Xiong'an New Area, Hebei, China

Location

Scope delivered by DLXN — design, supply, installation and commissioning

Rooftop PV on Energy Station No. 5 in the Rongdong district of Xiong'an New Area, Hebei. The array serves the station's own consumption and feeds surplus to the grid. DLXN designed the layout around the roof's construction sequence, supplied the modules and inverters, and carried out installation and commissioning in August 2024 — while the surrounding district was still under construction.

SiteEnergy Station No. 5, Rongdong district, Xiong'an New Area, Hebei
DLXN scopeDesign, equipment supply, installation and commissioning
SystemGrid-tied rooftop PV, station self-consumption with export
Modules550 W × 280 = 154 kWp
InvertersGoodWe 100 kW × 1 + GoodWe 25 kW × 2 (150 kW AC)
DC / AC ratio1.03 — sized for a roof with no room to expand later
CompletedAugust 2024

Site photos

Installers working along the module row on the station roof
Installation on the station roof — ballasted bases on the tiled deck, cable tray run along the row.
Energy station roof deck with mounting posts and tower cranes behind
The station deck during the build: mounting posts set out on concrete, with the district's tower cranes behind.

Layout note

the roof is shared with plant and access routes, so the array is split across usable bands rather than one continuous field. That keeps walkways clear for maintenance and keeps string lengths balanced across the three inverters — a 100 kW unit carrying the main field, with two 25 kW units picking up the shorter bands.